2013年9月23日星期一

Environmental issues after capital chain

Mr Xu, chairman of baosteel, told reporters that for steel industry, environmental protection problems, second only to capital chain, this knife is another a knife over the heads of the steel industry.At present, the serious problem of iron and steel enterprise asset ratio. 85 large and medium-sized steel enterprises, the asset-liability ratio in more than 75% of more than 30, more than 80% of the more than 20,galvanized steel pipe manufacturers china and some enterprise asset-liability ratio is above 90%.

Mr Xu, the problem of environmental protection and capital chain is iron and steel industry of the seriousness of environmental problems.In Mr Xu's view, at present the whole steel industry to the period of downturn, iron and steel industry is only now into the season,ASME B16.9 Butt Welded reducing tee "late autumn" real "cold winter" are yet to come.Environmental problems do not pass, in the "winter" comes, there will be a large number of enterprises to pour in front of the "green barriers".

Mr Xu said: "must strictly abide by the environmental protection laws and regulations as the enterprise conscious action, in the aspect of environmental protection can't take any chances,pipe fitting 45 degree LR elbows otherwise we part of the enterprise may not because of mismanagement, but because of environmental violations were knocked out."Tangshan, a steel factory boss tells a reporter, some time ago, the government is very strict with the environmental inspections, seems a little serious. But there is a certain scale mills basic will be ok. Local government is not willing to and GDP.

The boss believes that the desulfurization work, for example, steel mills on the desulfurization technology is not active,Electric Resistance welding carbon steel tube its reason or because of "shortage of money". "On the one hand, the cost is high, on the other hand, for verification. In the capital and verification, enveloped by steel mills in a hurry on desulfurization technology, the effect how, can only and line and see."

Xu Kuangdi suggested that China's steel industry production capacity "to" should use administrative means and market means. First of all, should be established on the basis of the state environmental protection standards steel capacity green certification and market access system, no longer will the blast furnace and furnace volume, the steel varieties, the enterprise scale as the elimination of backward production capacity standards; Secondly, in the strict regulation of the iron and steel enterprise, on the basis of energy-saving emission reduction targets, according to the high or low emission levy a tax on ladder environment. Environmental protection substandard are mostly small and medium-sized iron and steel enterprise, all that green taxes can be classified as provincial public finance income, strengthening the government at the provincial level backward steel production capacity of main body role.

2013年9月22日星期日

Safety first

Subsidence, waterlogging, and bridge, gas explosion, and in recent years, the underground pipeline accidents, road and bridge,114mm carbon seamless steel pipe china suppliers frequent accidents, serious threat to people's lives and property safety, affect the normal operation of the city.

For this purpose, the "opinions" clear, "safety first" is an important basic principles of strengthening the construction of urban infrastructure. Requirement to improve urban pipeline, drains, fire control, transportation, sewage and garbage disposal and other infrastructure construction, operational standards and quality management level,carbon steel spiral welded tube to eliminate potential safety problems, enhance the capacity of urban disaster prevention and mitigation, to ensure the safety of urban operation.

, vice President of the China academy of urban planning Shao Yisheng said: "in recent years, represented by the water security of city security problem becomes more and more serious. Urban water supply system is for the urban arterial blood transfusion,astm a234 CS seamless elbow R=1.5D blood transfusion capacity of existing water supply facilities to meet the needs of rapid urbanization, and must strengthen the infrastructure construction and retrofit, improve the ability of water supply security and support."

Qin hong said: "with skyscrapers, takahashi erected, traffic such as comparison of the dragon,galvanized steel pipe manufacturers china our city in public facilities resist the disaster ability deficiency, reserve is insufficient, the ability to respond to emergencies is extremely fragile, the short board, has become a city construction must be strengthened."

Shao Yisheng said that by the end of 2012, our country city has gathered as much as 51.7% of the population and more than 80% of the economy and social wealth. He said: "the urban infrastructure is the guarantee for safe operation of the urban lifeline, once appear problem, not only huge losses, and affect the global. Improve the urban environment safety, can not only benefit the masses, but also improve the quality of new urbanization."

2013年9月15日星期日

To capacity "should be administrative and market-oriented and two kinds of means

Since this year, iron and steel industry as a whole still difficult operation. , according to data from July 1 to China's crude steel production growth of 7.1% year-on-year, while only 2.1% increase over the same period of last year. Rapid release capacity and demand does not match that of slow market oversupply, schedule 40 hot dipped galvanized steel tubing and form a small profit. July 1 to industry average profit rate is only 0.23%, the main business is on the verge of loss.

Iron and steel industry at present the small profit condition is the enterprise for a long time of expansive development mode and extensive management mode of the result of joint action. "Rome was not built in a day", 180 degree short radius elbow manufacturer the reason of complexity and the change of domestic situation determines the difficulties there will be a long time. "I'm afraid this period lasts 5 to 10 years." Held by the China iron and steel technology in high-end economic BBS, former dean of Chinese academy of engineering, China society of metal Xu Kuangdi thought.

Mr Xu, chairman of baosteel, China's iron and steel association, said, "now the whole steel industry has not yet reached the downturn, just entered the 'late autumn season, Industry Standard Welding Neck Flange the real" cold winter "are yet to come, steel capacity comprehensive surplus pattern cannot fundamentally change in the short term, the challenge for the next 10 years the iron and steel enterprises will be more and more big. Factors of production costs rising, environmental resources pressure increasing, the economic situation reversed transmission from large-scale iron and steel enterprise's investment in fixed assets to meet the market demand of extensive growth mode, to give priority to with structure adjustment and transformation and upgrading of development model."

At present, our country is in economic transition period, API 5L steel pipe wall thickness 50mm growth in steel demand has slowed, and the world economy is in a slow recovery, so, no matter from the domestic market or international market is supply greater than demand. At the same time, because the steel equipment manufacturing capacity, strong construction strength, as well as the investment cost greatly reduced, the steel industry has been out of the inheritance of "difficult to get out of the" into "yi jin out hard" industry, which makes the rapid increase of steel production capacity greatly enhanced, even if the market demand, will be quickly has formed the production capacity and new capacity to fill.

2013年9月12日星期四

Choose reform rather than loosening monetary response to the economic downturn

Premier li keqiang in dalian meeting yesterday to hemispherical pipe cap manufacturer in china attend the 2013 summer davos BBS on behalf of the entrepreneur, in response to the Italy's eni group chairman, giuseppe Ritchie question, said at the time of economic long radius butt weld pipe elbow 45 Degree downward pressure, choose another way to deal with China.

"Since 2013, China's economic growth is slowing, though this is the result of the Chinese government actively control, but at the same time it also sparked international concern about the outlook astm a53 schedule 80 galvanized steel pipe for China's long-term economic development, what do you think of this?" Ritchie questions.Li, said at the time A53B ERW carbon steel welding round tube of economic downward pressure, one option is to adjust macroeconomic policy, increase the deficit, loosening of monetary, which may have short-term effect, but not necessarily beneficial for the future.

"We chose another - is to keep concentration, cool, comprehensive ShiCe, accurate power." Li said, especially highlight the biggest bonus release reform, stimulate the vitality of market, adjust the economic structure, transformation of the mode of development and make them organically and steady growth.

Do not deny that, li said, the future will encounter in the economic development of one kind or another risk and challenge, however, we have the courage to keep the concentration and the wisdom to solve the problem, the industry of its people have 1.3 billion more. We have the ability, also have a condition to overcome the way one of the difficulties and challenges, to achieve long-term sustainable and healthy economic development in China.

2013年9月5日星期四

Descibes shares land valuation of 40 billion while on harden

Market watches land circulation concept stocks yesterday again strong, descibes shares also rushed harden by rumors of land valuation of 40 billion, and drive the steel strands of the collective 180 degree short radius elbow manufacturer strength, throughout the whole steel plate up 2.91%. But descibes shares the "land valuation for" I'm afraid just Electric Resistance Welded carbon steel pipe wishful thinking of market capital, the company has said the factory land for leasing.

Yesterday, shares descibes opening seal harden, closed at 3.47 yuan/share. Shares in descibes leads, the iron and steel shares the collective strength, the whole steel plate rose 2.91%, except descibes schedule 40 hot dipped galvanized steel tubing shares, fushun special steel special (,) (600399. SH) to harden the same close, moreover bayi steel special (,) (600581. SH), baosteel special (,) (600019. SH), shagang co special (,) (002075 SZ) rose by more than 5%.

Recently, the concept of land SCH160 Nominal Wall Thickness welded Pipe circulation. According to the hangzhou government announced in May this year for the 2013 ~ 2016 in hangzhou area and north bridge area environment comprehensive improvement work task summary table ", descibes group have been listed in company closures ZhuanQian project "start a group". It is reported that more than the factory area of 4000 acres of descibes shares, will start the relocation plan in the past four years, land revaluation value up to 40 billion.